Project Description: Install a new Schneider three phase distribution board in the new training facility building including the following installations :

  • Install 4 inch cable tray from mains switch room out to the new training facility
  • Install Sikla cable system over the drive way between the main building and the wall opposite for cable support
  • Install 35mm 5 core armoured cable along tray route using metal tie wraps to secure
  • Install 1 x new general lighting circuit including 6 x LED 5ft battern light fitting manufactured by Ansell c/w 5 year warranty
  • Install emergency lighting as required to include test key switch
  • Install 1 x 32 amp three phase circuit complete with 32A red commando socket, position to be confirmed on site
  • Install 3 x 16 single phase circuit complete with blue commando sockets for roller shutter doors
  • Install power to the roller shutter doors
  • Carry out full test and issue certificates and OEM manual